We are a leading company in the production of electrical energy. Our objective is to develop investments aimed at the energy market with national and international projection.

14

Power Plants

throughout the country

INSTALLED CAPACITY

6,703 MW

Annual Generation

21,394

GWH

=

20,13%

PRIVATE sector generation

We currently have a diversified energy matrix with 14 power plants throughout the country (thermal, wind, hydroelectric and solar energy) which together represent an installed capacity of 6,703 MW and an annual generation of 21,394 GWH (equivalent to 20.13% of private sector generation).

In the last 20 years, we have pursued a policy of continuous investment and growth. We contribute to the generation and supply of electricity from renewable energy sources, in line with our commitment to the environment, providing solutions to current needs.

Starting in 2023, we ventured into forestry and mining activities through the acquisition of new companies.

At the same time, we have participation in 3 Combined Cycles under the FONINVEMEM Program: Central Vuelta de Obligado S.A., Termoeléctrica José de San Martín S.A. and Manuel Belgrano S.A. These sites operate a total power of 2,554 MW.

Our plants

Learn about the sites where we operate

  • It operates three thermoelectric plants totaling 1,747 MW of installed capacity, which represents 4% of the SADI generation park share and 7% of the country's thermal generation share:

    Nuevo Puerto and Puerto Nuevo are steam turbine (TV) type power plants, with a total of five units and an installed capacity of 360 MW and 589 MW respectively.

    The Combined Cycle (CC) power plant has an installed capacity of 798 MW.

    Nuevo Puerto Area + CC: 8.81 hectares.

    Location: Puerto de Buenos Aires

    Puerto Nuevo Area: 14.8 hectares.

  • It operates a highly diversified plant composed of four conventional cycle monoblock units operated by steam, with an installed capacity of 661 MW of power and two Combined Cycle units, the first with 277 MW of power and the second with 851 MW of gross configured power composed by two gas turbogenerators and one steam turbogenerator.

    In this way, Central Costanera totals 1,789 MW of installed capacity, which represents 4% of the total power of the SADI and 5% of the country's thermal generation share.

    Location: Puerto de Buenos Aires

  • It has four Francis turbines and their associated generators with an installed power of 1,440 MW (4×360 MW).

    The CPSA hydroelectric complex includes a gravity concrete dam with a maximum height of 170 meters above its foundation, intake structures and aqueducts, a spillway with a capacity to discharge 10,000 m³/s, river diversion works, a bottom outlet, and construction facilities including access roads, a bridge, and power supply installations.

    Plant Area: 1,055 hectares

    Location: Piedra del Águila Neuquén

  • The plant has an installed capacity of 575 MW and comprises 10 generation units of different technologies:

    A Combined Cycle (Siemens-Skoda DC), made up of a 195.97 MW Siemens gas turbine and a 92.5 MW Skoda steam turbine, totaling 288.47 MW.

    It has 3 ABB gas turbines, with one having an installed gross power of 27 MW and the other two with 22.8 MW each.

    Two Marelli steam turbines, each of 60 MW, totaling 120 MW.

    A mini hydroelectric power plant with an Ossberger turbine and generator of 1 MW.

    A Siemens cogeneration unit with 93 MW and 125 tons per hour of steam.

    Plant Area: 50 hectares.

    Location: Lujan de Cuyo, Mendoza

  • Combined cycle conventional power cogeneration plant, based on a system of alternating gas and/or gas oil, with an installed capacity of 365 MW in two modules.

    Gas Turbine (TG) brand Siemens model SGT5-4000 F, 270 MW net.

    Siemens SST600 steam turbine, with a net capacity of 95 MW.

    Steam export to T6 Industrial S.A. for their production process, up to 370 tons per hour of steam, at two pressure levels.

    Entered the Wholesale Electricity Market (MEM) in Simple Cycle mode (only GT) in November 2020, and the Combined Cycle Cogeneration (GT+ST+Steam Export) in October 2021.

    Plant Area: Approximately 6 hectares.

    Location: Puerto San Martín, Santa Fe

  • The plant, equipped with a dual-fuel Siemens SGT5-4000 F gas turbine with a nominal total power of 292 MW, will benefit from the combined cycle upgrade, adding an additional 140 MW. This will result in a total capacity of 432 MW, enabling it to supply power to over 300,000 households nationwide, injecting power into the interconnected system through a 132 kV connection.

    Location: Sauce viejo, Santa Fe

  • icono_mapa 15 NORDEX ACCIONA wind turbines

    icono_mapa Installed Capacity: 48 MW.

    icono_mapa Annual Energy: 187,612 MWh ~ 188 GWh. Equivalent to supplying energy to 52,115 households.

    icono_mapa Reduction of emissions by 85,739 tons of CO2 equivalent annually

    icono_mapa Operations started in September 2018

    icono_mapa Location: Achiras Córdoba

  • icono_mapa 15 VESTAS wind turbines

    icono_mapa Installed Capacity: 57 MW

    icono_mapa Annual Energy: 237,830 MWh ~ 238 GWh Equivalent to supplying energy to 66,064 households

    icono_mapa Reduction of emissions by 108,688 tons of CO2 equivalent annually

    icono_mapa Operations started in March 2020

    icono_mapa Location: Achiras Cordoba

  • icono_mapa 6 VESTAS wind turbines

    icono_mapa Installed Capacity: 22.8 MW

    icono_mapa Annual Energy: 99,567 MWh ~ 100 GWh Equivalent to supplying energy to 27,658 households

    icono_mapa Reduction of emissions by 45,502 tons of CO2 equivalent annually

    icono_mapa Operations started in February 2020

    icono_mapa Location: Achiras Cordoba

  • icono_mapa 32 NORDEX/ACCIONA 3.15 MW wind turbines

    icono_mapa Installed Capacity: 100.8 MW

    icono_mapa Annual Energy: 398,035 MWh ~ 398 GWh Equivalent to supplying energy to 110,566 households

    icono_mapa Reduction of emissions by 181,902 tons of CO2 equivalent annually

    icono_mapa Operations started in August 2018. 13.44% of the components purchased are national

    icono_mapa Location: Villarino – Buenos Aires

  • icono_mapa 4 VESTAS V126 - 3.8 MW wind turbines

    icono_mapa Installed Capacity: 15.2 MW

    icono_mapa Annual Energy: 69,801 MWh ~ 70 GWh Equivalent to supplying energy to 19,340 households.

    icono_mapa Reduction of emissions by 31,900 tons of CO2 equivalent annually.

    icono_mapa Operations started in August 2019.

    icono_mapa Location: Villarino – Buenos Aires

  • icono_mapa 21 VESTAS V136 - 4.2 MW wind turbines

    icono_mapa Installed Capacity: 88.2 MW

    icono_mapa Annual Energy: 390 GWh Equivalent to supplying energy to 108,333 households.

    icono_mapa Reduction of emissions by 179,400 tons annually.

    icono_mapa OPERATIONS STARTED IN NOVEMBER 2020. 97% of the components purchased are national.

    icono_mapa Location Bahía Blanca – Buenos Aires

  • icono_mapa 11 VESTAS V126-3.8 MW wind turbines

    icono_mapa Installed Capacity: 41.8 MW"

    icono_mapa Annual Energy: 176,808 MWh ~ 177 GWh Equivalent to supplying energy to 49,114 households.

    icono_mapa Reduction of emissions by 80,802 tons of CO2 equivalent annually

    icono_mapa OPERATIONS STARTED IN OCTOBER 2019 97% of the components purchased are national.

    icono_mapa Location Bahía Blanca – Buenos Aires

  • icono_mapa 358,560 PV modules - 3,984 Trackers

    icono_mapa Installed power: 117 MWdc.

    icono_mapa Annual Energy: 310 GWh. It is equivalent to supplying energy to 82,000 homes.

    icono_mapa Emission reduction of 114,000 Tn of CO2 Eq. Annual.

    icono_mapa Start of operations: July 2021.

    icono_mapa Location: Las Flores, San Juan.

  • icono_mapa

    Heritage: 160 thousand hectares.

    icono_mapa

    Conservation Areas: 36% of the heritage that includes areas of high conservation value.

    icono_mapa

    Planting Areas: 42% affected the productive project of pine and eucalyptus plantations.

    icono_mapa

    Asset Distribution: 10% in the province of Entre Ríos and 90% in the province of Corrientes.

    Forest Management with FSC® certification, aimed at the production of high quality solid wood.

Discover all our markets

More info
Numbers and Statistics
INSTALLED CAPACITY 2023
6,703 MW
2023 GENERATION
21,394 GWh
20,13% MARKET SHARE (Private Sector Generation)
14
CENTRALS IN 6 PROVINCES
+3 CENTRALS PARTICIPATED
6
TYPES OF GENERATION TECHNOLOGY
60%
Of generation Backed by contracts maintenance contracts with Leading manufacturers (LTisa)
Renewable Power
480 MW
160,453 HA
In Entre Ríos and Corrientes
71,000 HA
planted hectares with eucalyptus and pine
Distribution and transportation of natural gas
ECOGAS PARTICIPATION
41%
in DGCE
22%
in DGCU
TGM
20%
of participation
15%
market share

To top
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.