Learn about the technologies and businesses we work with.
It has four Francis turbines and their associated generators with an installed power of 1,440 MW (4×360 MW).
The CPSA hydroelectric complex includes a gravity concrete dam with a maximum height of 170 meters above its foundation, intake structures and aqueducts, a spillway with a capacity to discharge 10,000 m³/s, river diversion works, a bottom outlet, and construction facilities including access roads, a bridge, and power supply installations.
Hydroelectric Plant
The plant, equipped with a dual-fuel Siemens SGT5-4000 F gas turbine with a nominal total power of 292 MW, will benefit from the combined cycle upgrade, adding an additional 140 MW. This will result in a total capacity of 432 MW, enabling it to supply power to over 300,000 households nationwide, injecting power into the interconnected system through a 132 kV connection.
Gas Power Plant
We develop and operate cogeneration plants that supply process steam to industry and electricity to the Wholesale Electricity Market.
Access our cogeneration projects:
San Lorenzo Plant160,000gross hectares
57% allocated to the forestry project
36% protection areas
Where 60% is pine and 40% is eucalyptus.
Native forests, wetlands, grasslands, and buffer zones.
We support the growth of mining in Argentina through strategic investments that strengthen our vision of sustainable development:
• We are the main shareholder of the Diablillos gold and silver project in Salta, with a 9.9% stake in AbraSilver Resource Corp.
• In Catamarca, we acquired 27.5% of the “Tres Cruces” lithium project, strengthening our role in the electric mobility value chain.
• Together with IFC, we worked to develop the first 140 km electric transmission line to supply renewable energy to mining companies in the northwest of Argentina, with a potential capacity of up to 400 MW.