Central Puerto S.A. Piedra del Águila Site

We have four Francis turbines and their connected generators with an installed capacity of 1,440MW (4×360 MW), which represents 4.54% of the installed capacity of the Sistema Argentino de Interconexión/SADI [“Argentine Interconnection System”] and 11.9% of the hydroelectric generation capacity of the country.
The hydroelectric complex operated by Central Puerto includes a concrete gravity dam with a maximum slope of 170 meters above its foundation, water intake and pipeline, spillway with a capacity to evacuate 10,000 m³/sec, river diversion works, bottom outlet and facilities for construction purposes, including access roads, bridge and power supply.

Plant Surface: 1,055 ha