{"id":2888,"date":"2022-03-14T19:24:59","date_gmt":"2022-03-14T19:24:59","guid":{"rendered":"https:\/\/cp.domo.com.ar\/noticias\/san-lorenzo-cogeneration-center-inauguration\/"},"modified":"2024-07-11T19:48:58","modified_gmt":"2024-07-11T19:48:58","slug":"san-lorenzo-cogeneration-center-inauguration","status":"publish","type":"noticias","link":"https:\/\/www.centralpuerto.com\/en\/noticias\/san-lorenzo-cogeneration-center-inauguration\/","title":{"rendered":"SAN LORENZO COGENERATION CENTER INAUGURATION"},"content":{"rendered":"\n<div class=\"feed-shared-update-v2__description-wrapper\" tabindex=\"0\" data-artdeco-is-focused=\"true\"><div class=\"feed-shared-inline-show-more-text feed-shared-update-v2__description feed-shared-inline-show-more-text--minimal-padding feed-shared-inline-show-more-text--expanded \" tabindex=\"-1\"><div class=\"feed-shared-text relative feed-shared-update-v2__commentary \" dir=\"ltr\"><span class=\"break-words\"><span dir=\"ltr\"><p>On 03\/14 we inaugurated the new <strong>San Lorenzo Cogeneration plant<\/strong>, the largest and most efficient electric power and steam plant in the country.<\/p><\/span><\/span><p>Our General Manager, Fernando Bonnet, was present at the opening ceremony; the Undersecretary of Energy of the Nation, Federico Basualdo; the Governor of the province of Santa Fe, Omar Perotti; the Mayor of the city of Puerto Gral. San Mart\u00edn, Carlos De Grandis; representatives of CAMMESA, Terminal 6, contractors and collaborators, among others.<\/p> <\/div><div class=\"feed-shared-text relative feed-shared-update-v2__commentary \" dir=\"ltr\">The magnitude of this project and its importance for the national electrical system can be summarized in the following data:<br\/>\n\u26a1 330 MW of total installed power (equivalent to the energy demanded by 220 thousand<br\/> \ud83c\udfe0\ud83d\udca8 340 Tn\/h steam export capacity, at two different pressures (7 and 13 bars).<br\/>\ud83c\udf31 700 tons reduced CO\u00b2 emissions.<br\/>\ud83c\udf2b\ufe0f 450dm3\/day savings generated in the consumption of natural gas.<br\/>\ud83d\udccf 2 vaporducts of more than 1.5km in length each.<br\/>\ud83d\udc77\ud83c\udffb 700 people involved in the construction process over three years.<p>At Central Puerto we continue to reaffirm the commitment to continue investing in our country and thus continue generating <a class=\"bold\" href=\"https:\/\/www.linkedin.com\/feed\/hashtag\/?keywords=energ%C3%ADaconfuturo&#038;highlightedUpdateUrns=urn%3Ali%3Aactivity%3A6909221836366958593\" data-attribute-index=\"4\" target=\"_blank\" rel=\"noopener\">#EnergyWithFuture<\/a>.<\/p><\/div><\/div><\/div>\n\n","protected":false},"featured_media":0,"template":"","class_list":["post-2888","noticias","type-noticias","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.centralpuerto.com\/en\/wp-json\/wp\/v2\/noticias\/2888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.centralpuerto.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/www.centralpuerto.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"version-history":[{"count":1,"href":"https:\/\/www.centralpuerto.com\/en\/wp-json\/wp\/v2\/noticias\/2888\/revisions"}],"predecessor-version":[{"id":2889,"href":"https:\/\/www.centralpuerto.com\/en\/wp-json\/wp\/v2\/noticias\/2888\/revisions\/2889"}],"wp:attachment":[{"href":"https:\/\/www.centralpuerto.com\/en\/wp-json\/wp\/v2\/media?parent=2888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}