La Castellana Wind Farm
1° stage 99 MW – 32 Aerog. Round 1.0 2° stage 15 MW – 4 Aerog. MATER |
|
13.44% of the purchased components are national | |
annual energy: Stage 1 439 GWh/year Stage 2 76 GWh/year It is equivalent to supply energy for 115,000 households at the first stage and 14,400 at the second stage |
|
Emission reduction in 241,535 Tn per year | |
Creation of 380 direct and indirect jobs positions during the construction |