La Castellana Wind Farm

1° stage 99 MW – 32 Aerog. Round 1.0
2° stage 15 MW – 4 Aerog. MATER
13.44% of the purchased components are national
annual energy:
Stage 1 439 GWh/year
Stage 2 76 GWh/year
It is equivalent to supply energy for 115,000 households at the first stage and 14,400 at the second stage
Emission reduction in 241,535 Tn per year
Creation of 380 direct and indirect jobs positions during the construction